Size was no obstacle when installing two boiler and one pump skid for the WPAFB C-line project. Assembling all three skids in our Cincinnati fabrication shop took nearly five months from start to finish while the team on-site placed overhead piping to prepare for the preassembled skids. To transport the skids, the largest of which weighed 38,000 pounds, TP contracted a crane rigging/trucking company to seamlessly move the skids from the fab shop to WPAFB for flawless installation. This was another successful project at WPAFB thanks to our CAD department, fab shop workers, the crane rigging team and on-site install team.
Fabrication
WPAFB C-Line
- MarketGovernment/Military
- StatusComplete
- Contract Size$6,059,524.53
- Delivery MethodDesign-Build
- OwnerGovernment Agency
- CM / GCGreenland Enterprises
- LocationDayton, OH
- SystemsHVAC, Plumbing