TP prefabricated and installed two long pieces of grease ductwork, one of which was 30 feet and the second 40 feet long. This ductwork runs vertically from the hotel’s basement kitchen up six stories to the roof exhaust. Prefabrication of this duct saved countless labor hours on-site minimizing installation time.
Fabrication
601 W. Main – Louisville Hotel
- MarketCommercial
- StatusComplete
- Contract Size$1,884,000.00
- OwnerVision Hospitality
- CM / GCHGC Construction
- LocationLouisville, KY
- SystemsPlumbing