Big Walnut Elementary + Central Energy Plant

News

Projects

Fabrication

Big Walnut Elementary + Central Energy Plant

To ensure the installation of piping and equipment went as effortlessly and fast as possible, TP built the entire mechanical room in our 100,000 square foot distribution center. The mechanical room was completely pre-assembled while the energy plant structure was simultaneously being built. Once the building was dried-in, the pre-assembled portion of the mechanical room was broken down into segments, then shipped to the job site to allow for an efficient and expedited installation. From disassembly to reassembly on-site, the process was performed in a period of four days.

  • MarketEducation
  • StatusComplete
  • Contract Size$6,360,000
  • ArchitectVSWC Architects
  • OwnerBig Walnut Local School District
  • CM / GCGilbane
  • LocationSunbury, OH
  • EngineerVeregy formerly Dynamix
  • SystemsPlumbing, HVAC (full mechanical rooms)

Other Fabrication Projects

601 W. Main – Louisville Hotel
Slot Drains
Mariemont Schools – Sewage Ejector Replacement