The project was the construction of an addition to Mariemont High School and renovations of the existing facility. Our team pre-assembled the sewage ejector to cut down installation time on-site from four days to 20 hours decreasing safety risks.
Fabrication
Mariemont Schools – Sewage Ejector Replacement
- MarketEducation
- StatusComplete
- Contract SizeHVAC - $2,265,204 PLMB - $405,000
- ArchitectMSA Architects
- OwnerMariemont City School District
- CM / GCTurner Construction
- LocationCincinnati, OH
- EngineerMOTZ Engineering
- SystemsHVAC, Plumbing - 2 separate contracts
New sewage ejector components attached to a piece of chemgrate for quick installation on-site
Each pump weighs 310 pounds. On-site, the temporary support rods were removed.
A temporary receiver was used to capture HVAC system condensate. A grinder pump was also used as back-up.
During installation, safety was on-site the entire time to prevent fall hazards while entering an existing 23 foot deep well.
Installation was completed after 20 hours.